• Home
  • Gallery
  • References
  • Safety
  • Clients
  • Careers
  • Contact

See pic of full contaminated galvanized duct piping in ceiling before removal

See pic of full contaminated galvanized duct piping in ceiling before removal
Flare Line Pipe Insulation

Flare Line Pipe Insulation
Ducting work, totally contaminated with pigeon debris

Ducting work, totally contaminated with pigeon debris
Left to right, temporary fuel tank for electrical generator,boiler heater,insulated hoarding,trailer decontamination unit.

Left to right, temporary fuel tank for electrical generator,boiler heater,insulated hoarding,trailer decontamination unit.
Final inspection after all removal complete. Piping, Ducting. Ceiling Tile completely removed.

Final inspection after all removal complete. Piping, Ducting. Ceiling Tile completely removed.


©  Alta-1 Mechanical Inc., Alta-1 Scaffolding Inc.
WebsitesCA Web Design Edmonton
Email: toni.bernard@alta1.ca